Challenge
Project challenge
The access point required a tall, free-standing modular arrangement with a compact working footprint.
An 18 m Cuplock scaffolding tower configured for elevated access beside an industrial building.
The access point required a tall, free-standing modular arrangement with a compact working footprint.
The Cuplock tower was configured with repeated braced lifts, a widened base, and an upper working platform.
The completed tower provided the planned high-level access adjacent to the industrial structure.
Practical answers for project, procurement and site teams.
Yes. Share the project brief, location and programme through Request a Quote so the suitable system and configuration can be reviewed.
Yes. Design and detailing review, product recommendation and site support are available where applicable.