CASE STUDY - INDUSTRIAL
Ola Electric 18 m Cuplock Tower
An 18 m Cuplock scaffolding tower configured for elevated access beside an industrial building.
Challenge
Project challenge
The access point required a tall, free-standing modular arrangement with a compact working footprint.
Solution
Schach solution
The Cuplock tower was configured with repeated braced lifts, a widened base, and an upper working platform.
Outcome
Result
The completed tower provided the planned high-level access adjacent to the industrial structure.
FAQ
Frequently Asked Questions
Common questions from procurement, project engineers, and site teams. Something missing? Talk to our team.




