Project challenge
The building geometry required coordinated wall, opening, and slab assemblies while construction continued across the structure.
Monolithic aluminium formwork for an institutional concrete structure, covering wall and slab casting stages.
The building geometry required coordinated wall, opening, and slab assemblies while construction continued across the structure.
The formwork package was configured from project drawings with panels and accessories organized for the required structural zones.
The installed system supported successive casting stages and produced finished concrete surfaces documented on site.