Skip to main content
Safety Screens · Chequered Ply Platform

Safety Screens with Chequered-Ply Working Platforms

Perimeter protection screens with chequered-ply planks that create enclosed working zones and protected access around active high-rise floor edges.

Applications

Used for

  • High-rise residential towers
  • Commercial towers
  • Slab-edge protection
  • External shutter and tie-rod work
  • Falling-debris control
  • Enclosed perimeter work zones
Components

Key components

  • Chequered-ply planks
  • Perforated protection sheets
  • Internal vertical legs
  • Wall-mounted shoes
  • Multi-location anchorage
  • Foldable gap-cover planks
Why this system

Benefits

  • Protected slab-edge working zone
  • Helps contain falling debris
  • Foldable planks support panel movement
  • Designed for repeated floor cycles
Planning inputs

What to share

  • Architectural, structural, and elevation drawings
  • Floor-to-floor height
  • Formwork modulation or shell plan
  • Building perimeter and slab-edge details
  • Crane suitability for erection and dismantling
  • Project wind criteria and construction cycle
Technical snapshot

Verified system parameters.

Safety-screen values are catalogue references only. Final loads, anchors, wind criteria, and layouts require project-specific engineering approval.

Typical screen-set width
Approx. 3 m
Approximate set weight
52 kg
Shoe material grade
EN 10.9
Catalogue wind basis
44 m/s
Finish
Zinc primer + spray paint
Execution support
2 initial cycles
Delivery process

From requirement to site execution.

  1. 01

    Review architectural drawings and floor-to-floor heights for a tentative quotation.

  2. 02

    Review structural and elevation drawings for the detailed commercial basis.

  3. 03

    Prepare the perimeter layout, sections, and screen arrangement.

  4. 04

    Coordinate formwork modulation and obtain client drawing approval.

  5. 05

    Release the approved BOQ and fabrication drawings to production.

  6. 06

    Inspect, fabricate, coat, assemble, and complete final quality checks.

  7. 07

    Coordinate first erection, initial jumps, and execution-team training.

Chequered Ply Platform media

Chequered Ply Platform in application.

Perimeter Safety Screens installed at the upper levels of a high-rise project
Perimeter Safety Screens installed at the upper levels of a high-rise project
Protected internal working platform within a safety-screen assembly
Protected internal working platform within a safety-screen assembly
FAQ

Frequently asked questions

Practical answers for project, procurement and site teams.

What is Chequered Ply Platform safety screens?

Timber-decked Perimeter Safety Screens.

How do I request a quote?

Use the Request a Quote page, select the family and subtype, then share your project location, quantity or height and timeline.

Do you provide project-specific technical support?

Yes. Technical review, product recommendation and site support are available where applicable.