CASE STUDY - INDUSTRIAL
Adani Mundra Cuplock Scaffolding
Hot-dip galvanized Cuplock scaffolding mock-up and practical site training for an industrial access requirement.
Challenge
Project challenge
The site team needed a clear reference assembly and practical familiarization with the modular access configuration.
Solution
Schach solution
A representative Cuplock scaffold was assembled on site and used for component, sequence, and access training with the working team.
Outcome
Result
The completed mock-up provided a physical reference for the planned scaffold arrangement and site handling process.