Project challenge
Critical wall, slab, and staircase interfaces needed to be checked together before the repetitive site sequence was released.
A project-specific aluminium formwork mock-up covering walls, deck zones, openings, staircase geometry, and supporting components.
Critical wall, slab, and staircase interfaces needed to be checked together before the repetitive site sequence was released.
A coordinated mock-up was assembled to review panel fit, prop locations, junctions, access, and the intended erection sequence.
The assembled mock-up created a full-scale reference for technical review, site familiarization, and installation planning.